Engineering knowledge into a project

The architecture. The know-how. The evidence.

NZP’s proposition combines high-temperature conversion principles with gas-processing interfaces, configuration models and project engineering.

From opportunity to evidence

Find your starting point.

6 topics

01 / Technology & IP

Conversion architecture

Submerged-arc furnace principles form the starting point for controlled high-temperature conversion of qualified material.

What to establish
  • Electrical load and operating conditions
  • Feedstock preparation and furnace design
  • Electrodes, refractory and residue handling
02 / Technology & IP

Gas processing & integration

Industrial cleaning, conditioning and separation connect raw gas with the selected output route.

What to establish
  • Contaminant load and cleaning stages
  • Mass and energy balance
  • Downstream equipment specification
03 / Technology & IP

Configuration models

Engineering and commercial models compare routes around a defined feedstock, site and offtake requirement.

What to establish
  • Model version and assumptions
  • Measured inputs and calibration
  • Uncertainty and independent review
04 / Technology & IP

Drawings & technical documentation

A project evidence pack can include the design basis, engineering drawings, equipment interfaces and operating procedures appropriate to its stage.

What to establish
  • Documentation scope and ownership
  • Revision control and design approval
  • Access, confidentiality and permitted use
05 / Technology & IP

IP & licensing review

Establish the rights needed for the proposed implementation, including relevant NZP know-how and third-party process technology.

What to establish
  • Patent and application records where applicable
  • Ownership and permitted use
  • Third-party licences and freedom-to-operate review
06 / Technology & IP

Training & knowledge transfer

Define the operating knowledge, training material and support needed for a safe handover.

What to establish
  • Training scope and operator competence
  • Manuals and maintenance procedures
  • Acceptance and ongoing support

Patent ownership, applications, licence scope and third-party rights should be established through the relevant records and agreements. This page makes no claim to a granted patent portfolio.

Understand the validation pathway.

Separate established industrial components, historical experience and project-specific evidence.

Explore the evidence
Bring your starting point

Let’s connect the material
with the opportunity.

Share your feedstock, site or product requirement for an initial technical and commercial discussion.

Start a project discussion